Energy · Indianapolis, Indiana · Founded 2025 · Formation stage
First American Nuclear (FANCO)
Developing EAGL-1, a 240 MWe lead-bismuth-cooled fast reactor, and its own HALEU fuel fabrication
Edge
35#14 · ▼2 in 7d
Why now
- NRC scheduled a meeting for Oct 15 on docket 99902156
Regulatory · Oct 8
- Filed Form D: $1.0M sold of $25.0M from 1 investor
Capital · Sep 18
Brief
Written by a research agent on Oct 2 from the sources below. A second agent checked each claim.
1st American Nuclear Co. (FANCO) is developing EAGL-1, a 240 MWe fast-spectrum small modular reactor cooled by lead-bismuth, and proposes its own HALEU fuel fabrication facility. Its Bridge Power offer starts a site on conventional boilers and steam turbines, meant to swap in EAGL-1 later. Headquarters are in Indianapolis, reactor development in Richland, Washington.
Why it fits
FANCO pairs energy with manufacturing: a 240 MWe reactor designed for factory fabrication, a proposed fuel plant, and a plan announced with the State of Indiana (reported at more than $4 billion) for manufacturing facilities and an energy park.
Stage and round
Five Form Ds report $13,687,050 sold: $1,250,000 of $2,500,000 in equity (filed 30 June 2025), $20,000 of $5,000,000 in SAFEs (29 August 2025), $10,000,000 from one investor (15 December 2025), $1,417,050 from four (22 December 2025), and $1,000,000 of $25,000,000 in equity and debt from one investor (18 September 2026). The filings name no investors. No round announcement was found. The company targets power from EAGL-1 by 2033.
Ask on the first call
- 01Who are the single investors behind the $10,000,000 (December 2025) and the $1,000,000 (September 2026), and is the latter a first close on the $25,000,000?
- 02What exactly was acquired from Columbia Basin Consulting Group (IP, test data, people), on what terms, and does FANCO own the EAGL-1 design outright?
- 03Your releases cite HALEU dioxide (April 2026) and mixed oxide and transuranic fuels (May 2026). Which fuel does the first core use, and who supplies it?
- 04Is there a signed customer or site for the Bridge Power phase, and why is the CTO announced in April 2026 not on the team page?
Risks
- –Capital gap. The five Form Ds report $13,687,050 sold, against a plan reported at more than $4 billion. The latest offering had sold $1,000,000 of $25,000,000 at filing.
- –Early licensing. Nuclear Engineering International called the design conceptual (November 2025) and a 2032 start over-optimistic. Sourced NRC steps are engagement plans and a letter of intent, not license applications.
- –Commercial traction is unproven. The Denham, AtkinsRéalis and Hyundai E&C announcements mention no equity investment in FANCO, and no source read names a power customer or plant site.
Could not confirm
- ?Neutron Bytes (8 November 2025) cites PitchBook for $2.52 million raised and names Foundt Capital as an investor. No primary source confirms either.
- ?World Nuclear News reports, citing the company's regulatory engagement plan, that the technology portfolio was acquired from Columbia Basin Consulting Group. Terms, dates and amounts are not given.
- ?The company says a PNNL review found the design would be licensable under existing NRC criteria. The PNNL report was not opened, so this is not confirmed.
First public mention · Sep 11, 2025In a PR Newswire release, the company introduced itself and its Eagle One reactor ahead of an investor summit in Oak Ridge.
SourcesForm D, 18 September 2026 ↗Form D, 15 December 2025 ↗Form D, 22 December 2025 ↗Form D, 29 August 2025 ↗Form D, 30 June 2025 ↗FANCO home page ↗FANCO team page ↗FANCO release, 15 April 2026 ↗Nuclear Engineering International, 10 November 2025 ↗Inside INdiana Business via 21Alive, 4 November 2025 ↗
People
- Bill StokesSearch ↗
President and founder. The company site says he has more than four decades in nuclear energy, including leadership roles supporting U.S. Department of Energy initiatives.
- Mike (Michael) ReinbothSearch ↗
CEO (Treasurer on the 2025 Form Ds). The company site cites executive roles at global enterprises and venture-backed companies in energy and technology, naming no prior employer.
- Nick (Nicholas) BurnettSearch ↗
COO (September 2026 Form D) or Chief Commercial Officer (team page). Per the site, an attorney with structured finance, mergers and acquisitions and energy project development background.
- Rafael PazSearch ↗
Chief Financial Officer, announced 15 April 2026. The company release says he held senior finance leadership roles at NuScale Power and bp.
- Michael ReinbothSearch ↗
Chief Executive Officer
Score
Capital, regulatory
× 0.95
Matched on energy, fission, nrc, nuclear, power plant
× 1.00
Almost no public footprint
× 0.85
5 named people, none from a top lab or company
43 × 0.95 × 1.00 × 0.85 = 35